top of page
![](https://static.wixstatic.com/media/7b17ef_d5147a93b2f64e9a8e7339493d7dda4e~mv2.jpg/v1/fill/w_147,h_71,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/be760008-f2cd-462b-8ee6-c0693c05dea0.jpg)
Old Buckenham
Goose played a more hands-on role in the construction of this build, focusing less on the architectural aspects and more on the on-site craftsmanship. Every detail, except for the oak elements which were built in a workshop, was hand-cut during the construction process. The project was completed in the summer of 2018.
bottom of page